Range of application
●Suitable for industrial facilities, equipment and civil products protective coating.
The construction method
●Primer 1KG/8m², top coat 1KG/4m²/2 times.
Range of application
●Suitable for spraying, brush coating, should keep the workpiece clean and dry before construction;
●The surface shall not have oil, gray sand, floating rust, welding slag, etc.
●Construction environment temperature ≥10℃, relative humidity ≤80%, narrow space to increase ventilation, accelerate drying film;
●If you want to get a thicker film thickness can be twice coated, coated interval time more than 4 hours;
●The two-component products shall be used up within the specified time after harmonization, and cannot be used after timeout;
●After construction, clean spraying equipment and pipelines with tap water in time.
Attention
●This product must be stirred evenly before use;
●The company’s products can be compatible with each other, but with oil compatibility must be in the primer dry and tested after construction;
●After construction can not rain, flush, completely dry after just as well.
●This product is water-based system, it is forbidden to mix acid, alkali, oil and other substances, to ensure the stability of the product system.